Space: March 14, 2000

Archives

An independent report commissioned by NASA says that staff cutbacks and other changes over the last few years had caused the staff to pay less attention to their work due to poor morale. The study recommended 10 long-term, 30 mid-term, 37 short-term, and 4 urgent changes to the shuttle program. One of the urgent recommendations, which the panel felt should be made before the next shuttle flight, was to make all wiring accessible to a visual inspection. Currently, about 20% of the wiring on a shuttle cannot be seen directly.--Stephen V Cole

 

X

ad

Help Keep Us From Drying Up

We need your help! Our subscription base has slowly been dwindling.

Each month we count on your contributions. You can support us in the following ways:

  1. Make sure you spread the word about us. Two ways to do that are to like us on Facebook and follow us on Twitter.
  2. Subscribe to our daily newsletter. We’ll send the news to your email box, and you don’t have to come to the site unless you want to read columns or see photos.
  3. You can contribute to the health of StrategyPage.
Subscribe   Contribute   Close